Building water pipe (underground tunnel)

As part of the project to build a 2100 mm water pipe, a MG-90 vibratory pile driver mounted on a CAT 345D excavator was used.Michaudville is specialized in civil engineering and infrastructure work. As part of the project to build a 2100 mm water pipe in a tunnel from the Notre-Dame/A. D. Roy intersection to Rosemont reservoir in Montreal, the company had to erect temporary retaining walls during the first stages of the project. To carry out this work, AZ-14 sheet piling and H-beams of different lengths were driven with a MG-90 vibratory pile driver mounted on a CAT 345D excavator.