Working between two railways without stopping train traffic in Nebraska

A MG-60 MultiGrip Pile Driver was the best equipment to solidify the ground between two railways following flooding.Our dealer’s client in Colombus, Nebraska needed to solidify the ground between two railways following flooding that fragilized the ground during the 2019 Spring. A MG-60 MultiGrip Pile Driver was the best equipment for this job. It installed four H beams in-line and PZC26 piles filled each section between them. The Grizzly MultiGrip agility ensured it could work nearby the rail road and allowed the equipment to be on site without stopping train traffic, as it could be promptly removed before the passing of trains.