{"id":15675,"date":"2026-02-06T20:09:17","date_gmt":"2026-02-06T20:09:17","guid":{"rendered":"https:\/\/www.gilbert-tech.com\/?page_id=15675"},"modified":"2026-02-06T20:09:17","modified_gmt":"2026-02-06T20:09:17","slug":"riprap-for-boardwalk-construction","status":"publish","type":"page","link":"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/","title":{"rendered":"Precision Pile Installation in Riprap for Future Boardwalk Construction"},"content":{"rendered":"<p style=\"font-weight: 400;\"><strong>Precision Pile Installation in Riprap for Future Boardwalk Construction<\/strong><br \/>\n<em>Innovative Solutions with the Gilbert MultiGrip MG-90 Pile Driver<\/em><br \/>\n<strong>Client:<\/strong> Northern Contracting Ltd. (NCL) \u2013 Sydney, Nova Scotia<br \/>\n<strong>Location:<\/strong> Baddeck, Nova Scotia<br \/>\n<strong>Equipment Used:<\/strong> Cat 336 Excavator with Gilbert MultiGrip MG-90 Side Grip Vibratory Pile Driver<br \/>\n<strong>Operator:<\/strong> Rick Brown<br \/>\n<strong>Superintendent:<\/strong> Evan McDonald<\/p>\n<p style=\"font-weight: 400;\">When Northern Contracting Ltd. (NCL) took on the task of installing 116 wood piles for a future boardwalk in Baddeck, Nova Scotia, they faced a significant challenge: how to achieve precise pile placement in a shoreline made up of dense, irregular riprap. Standard pile-driving methods were simply not up to the task. That\u2019s where innovation\u2014and the Gilbert MultiGrip MG-90\u2014made all the difference.<\/p>\n<p style=\"font-weight: 400;\"><strong>Meeting the Challenge<\/strong><\/p>\n<p style=\"font-weight: 400;\">The project required each of the 30-foot-long wood piles to be driven with exacting accuracy to form a solid foundation for the upcoming boardwalk. However, the existing riprap shoreline made traditional pile driving nearly impossible. The uneven and compact rock structure posed high risks of misalignment and damage, potentially compromising the long-term stability of the structure.<\/p>\n<p style=\"font-weight: 400;\"><strong>An Innovative Approach<\/strong><\/p>\n<p style=\"font-weight: 400;\">To tackle this complex problem, NCL\u2019s team developed a custom pre-drilling method that proved both effective and efficient. Using a fabricated iron predrill pile, they pre-drilled 8- to 10-foot-deep holes directly into the riprap. The predrill pile was pinched and held securely under the MG-90\u2019s side grip, which offered the stability and control needed for such a precise operation.<\/p>\n<p style=\"font-weight: 400;\">This inventive technique delivered several key benefits:<\/p>\n<ul style=\"font-weight: 400;\">\n<li>Accurate alignment of the pre-drilled holes<\/li>\n<li>Streamlined wood pile insertion<\/li>\n<li>Minimized stress on both equipment and materials<\/li>\n<\/ul>\n<p style=\"font-weight: 400;\">Once the pre-drilling was complete, the wood piles were placed into the aligned holes and driven to depth using a drop hammer. The result: precise, secure installation in one of the most challenging environments imaginable.<\/p>\n<p style=\"font-weight: 400;\"><strong>MG-90 Versatility in Action<\/strong><\/p>\n<p style=\"font-weight: 400;\">Beyond the boardwalk foundation, the Gilbert MG-90 was also utilized to install a sheet piling wall for additional in-water work at the same location. This showcased the MG-90\u2019s flexibility and powerful performance across multiple applications within a single project.<\/p>\n<p style=\"font-weight: 400;\"><strong>Field-Tested Performance<\/strong><\/p>\n<p style=\"font-weight: 400;\">Both Rick Brown, the equipment operator, and Evan McDonald, the site superintendent, praised the MG-90 for its reliability and efficiency. Their collaborative effort\u2014and willingness to adapt and innovate\u2014highlighted the strength of NCL\u2019s team and the advanced capabilities of Gilbert\u2019s equipment in solving real-world challenges.<\/p>\n<p style=\"font-weight: 400;\"><strong>Continued Success<\/strong><\/p>\n<p style=\"font-weight: 400;\">With the Baddeck project complete, the Cat 336 equipped with the Gilbert MG-90 was promptly deployed to a new job site, underlining the portability and readiness of this setup for back-to-back operations.<\/p>\n<p style=\"font-weight: 400;\"><strong>About Gilbert Products<\/strong><br \/>\nAt Gilbert, we pride ourselves on delivering innovative piling solutions that push the boundaries of what\u2019s possible in the field. The MultiGrip MG-90 Side Grip Vibratory Pile Driver is engineered for versatility, power, and precision\u2014empowering contractors to tackle even the most demanding projects with confidence.<\/p>\n<p style=\"font-weight: 400;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-15677\" src=\"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/1637211302357320826-576x1024.jpg\" alt=\"\" width=\"576\" height=\"1024\" srcset=\"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/1637211302357320826-576x1024.jpg 576w, https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/1637211302357320826-169x300.jpg 169w, https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/1637211302357320826.jpg 720w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-15679\" src=\"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/2317213843622425353-1024x768.jpg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/2317213843622425353-1024x768.jpg 1024w, https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/2317213843622425353-300x225.jpg 300w, https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/2317213843622425353-768x576.jpg 768w, https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/2317213843622425353.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-15681\" src=\"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/9111670223573258299-768x1024.jpg\" alt=\"\" width=\"768\" height=\"1024\" srcset=\"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/9111670223573258299-768x1024.jpg 768w, https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/9111670223573258299-225x300.jpg 225w, https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/9111670223573258299.jpg 960w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/p>\n<p style=\"font-weight: 400;\">\n","protected":false},"excerpt":{"rendered":"<p>Precision Pile Installation in Riprap for Future Boardwalk Construction Innovative Solutions with the Gilbert MultiGrip MG-90 Pile Driver Client: Northern Contracting Ltd. (NCL) \u2013 Sydney, Nova Scotia Location: Baddeck, Nova Scotia Equipment Used: Cat 336 Excavator with Gilbert MultiGrip MG-90 Side Grip Vibratory Pile Driver Operator: Rick Brown Superintendent: Evan McDonald When Northern Contracting Ltd. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":15677,"parent":11315,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"template-single-projet.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-15675","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.8 (Yoast SEO v25.8) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Precision Pile Installation in Riprap: NCL &amp; Gilbert MG-90 Case Study | Gilbert Products<\/title>\n<meta name=\"description\" content=\"A MG-90 side-grip vibratory pile driver mounted on a 36-ton CAT excavator was used for the installation of retaining walls a huge highway.See how Northern Contracting Ltd. tackled a challenging rocky shoreline in Baddeck using the Gilbert MG-90 side grip pile driver and an innovative pre-drilling method.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Precision Pile Installation in Riprap for Future Boardwalk Construction\" \/>\n<meta property=\"og:description\" content=\"A MG-90 side-grip vibratory pile driver mounted on a 36-ton CAT excavator was used for the installation of retaining walls a huge highway.See how Northern Contracting Ltd. tackled a challenging rocky shoreline in Baddeck using the Gilbert MG-90 side grip pile driver and an innovative pre-drilling method.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"Les Produits Gilbert\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100063548473541&amp;viewas&amp;show_switched_toast=false&amp;show_switched_tooltip=false&amp;is_tour_dismissed=false&amp;is_tour_completed=false&amp;show_podcast_settings=false&amp;show_community_review_changes=false&amp;should_open_composer=false&amp;badge_type=NEW_MEMBER&amp;show_community_rollback_toast=false&amp;show_community_rollback=false&amp;show_follower_visibility_disclosure=false&amp;bypass_exit_warning=true&amp;locale=fr_CA\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/1637211302357320826.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"720\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/\",\"url\":\"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/\",\"name\":\"Precision Pile Installation in Riprap: NCL & Gilbert MG-90 Case Study | Gilbert Products\",\"isPartOf\":{\"@id\":\"https:\/\/www.gilbert-tech.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/1637211302357320826.jpg\",\"datePublished\":\"2026-02-06T20:09:17+00:00\",\"description\":\"A MG-90 side-grip vibratory pile driver mounted on a 36-ton CAT excavator was used for the installation of retaining walls a huge highway.See how Northern Contracting Ltd. tackled a challenging rocky shoreline in Baddeck using the Gilbert MG-90 side grip pile driver and an innovative pre-drilling method.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/#primaryimage\",\"url\":\"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/1637211302357320826.jpg\",\"contentUrl\":\"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/1637211302357320826.jpg\",\"width\":720,\"height\":1280},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.gilbert-tech.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction\",\"item\":\"https:\/\/www.gilbert-tech.com\/en\/construction\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Job stories\",\"item\":\"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Precision Pile Installation in Riprap for Future Boardwalk Construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.gilbert-tech.com\/en\/#website\",\"url\":\"https:\/\/www.gilbert-tech.com\/en\/\",\"name\":\"Les Produits Gilbert\",\"description\":\"Innovation. Qualit\u00e9. Productivit\u00e9.\",\"publisher\":{\"@id\":\"https:\/\/www.gilbert-tech.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.gilbert-tech.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.gilbert-tech.com\/en\/#organization\",\"name\":\"Gilbert Products\",\"url\":\"https:\/\/www.gilbert-tech.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gilbert-tech.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2025\/03\/305270727_507252688069676_4369697491652398340_n.jpg\",\"contentUrl\":\"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2025\/03\/305270727_507252688069676_4369697491652398340_n.jpg\",\"width\":1638,\"height\":1638,\"caption\":\"Gilbert Products\"},\"image\":{\"@id\":\"https:\/\/www.gilbert-tech.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/profile.php?id=100063548473541&viewas&show_switched_toast=false&show_switched_tooltip=false&is_tour_dismissed=false&is_tour_completed=false&show_podcast_settings=false&show_community_review_changes=false&should_open_composer=false&badge_type=NEW_MEMBER&show_community_rollback_toast=false&show_community_rollback=false&show_follower_visibility_disclosure=false&bypass_exit_warning=true&locale=fr_CA\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Precision Pile Installation in Riprap: NCL & Gilbert MG-90 Case Study | Gilbert Products","description":"A MG-90 side-grip vibratory pile driver mounted on a 36-ton CAT excavator was used for the installation of retaining walls a huge highway.See how Northern Contracting Ltd. tackled a challenging rocky shoreline in Baddeck using the Gilbert MG-90 side grip pile driver and an innovative pre-drilling method.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/","og_locale":"en_US","og_type":"article","og_title":"Precision Pile Installation in Riprap for Future Boardwalk Construction","og_description":"A MG-90 side-grip vibratory pile driver mounted on a 36-ton CAT excavator was used for the installation of retaining walls a huge highway.See how Northern Contracting Ltd. tackled a challenging rocky shoreline in Baddeck using the Gilbert MG-90 side grip pile driver and an innovative pre-drilling method.","og_url":"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/","og_site_name":"Les Produits Gilbert","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100063548473541&viewas&show_switched_toast=false&show_switched_tooltip=false&is_tour_dismissed=false&is_tour_completed=false&show_podcast_settings=false&show_community_review_changes=false&should_open_composer=false&badge_type=NEW_MEMBER&show_community_rollback_toast=false&show_community_rollback=false&show_follower_visibility_disclosure=false&bypass_exit_warning=true&locale=fr_CA","og_image":[{"width":720,"height":1280,"url":"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/1637211302357320826.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/","url":"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/","name":"Precision Pile Installation in Riprap: NCL & Gilbert MG-90 Case Study | Gilbert Products","isPartOf":{"@id":"https:\/\/www.gilbert-tech.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/#primaryimage"},"image":{"@id":"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/1637211302357320826.jpg","datePublished":"2026-02-06T20:09:17+00:00","description":"A MG-90 side-grip vibratory pile driver mounted on a 36-ton CAT excavator was used for the installation of retaining walls a huge highway.See how Northern Contracting Ltd. tackled a challenging rocky shoreline in Baddeck using the Gilbert MG-90 side grip pile driver and an innovative pre-drilling method.","breadcrumb":{"@id":"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/#primaryimage","url":"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/1637211302357320826.jpg","contentUrl":"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2026\/02\/1637211302357320826.jpg","width":720,"height":1280},{"@type":"BreadcrumbList","@id":"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/riprap-for-boardwalk-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.gilbert-tech.com\/en\/"},{"@type":"ListItem","position":2,"name":"Construction","item":"https:\/\/www.gilbert-tech.com\/en\/construction\/"},{"@type":"ListItem","position":3,"name":"Job stories","item":"https:\/\/www.gilbert-tech.com\/en\/construction\/job-stories\/"},{"@type":"ListItem","position":4,"name":"Precision Pile Installation in Riprap for Future Boardwalk Construction"}]},{"@type":"WebSite","@id":"https:\/\/www.gilbert-tech.com\/en\/#website","url":"https:\/\/www.gilbert-tech.com\/en\/","name":"Les Produits Gilbert","description":"Innovation. Qualit\u00e9. Productivit\u00e9.","publisher":{"@id":"https:\/\/www.gilbert-tech.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gilbert-tech.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.gilbert-tech.com\/en\/#organization","name":"Gilbert Products","url":"https:\/\/www.gilbert-tech.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gilbert-tech.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2025\/03\/305270727_507252688069676_4369697491652398340_n.jpg","contentUrl":"https:\/\/www.gilbert-tech.com\/wp-content\/uploads\/2025\/03\/305270727_507252688069676_4369697491652398340_n.jpg","width":1638,"height":1638,"caption":"Gilbert Products"},"image":{"@id":"https:\/\/www.gilbert-tech.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100063548473541&viewas&show_switched_toast=false&show_switched_tooltip=false&is_tour_dismissed=false&is_tour_completed=false&show_podcast_settings=false&show_community_review_changes=false&should_open_composer=false&badge_type=NEW_MEMBER&show_community_rollback_toast=false&show_community_rollback=false&show_follower_visibility_disclosure=false&bypass_exit_warning=true&locale=fr_CA"]}]}},"_links":{"self":[{"href":"https:\/\/www.gilbert-tech.com\/en\/wp-json\/wp\/v2\/pages\/15675","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gilbert-tech.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.gilbert-tech.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.gilbert-tech.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gilbert-tech.com\/en\/wp-json\/wp\/v2\/comments?post=15675"}],"version-history":[{"count":1,"href":"https:\/\/www.gilbert-tech.com\/en\/wp-json\/wp\/v2\/pages\/15675\/revisions"}],"predecessor-version":[{"id":15683,"href":"https:\/\/www.gilbert-tech.com\/en\/wp-json\/wp\/v2\/pages\/15675\/revisions\/15683"}],"up":[{"embeddable":true,"href":"https:\/\/www.gilbert-tech.com\/en\/wp-json\/wp\/v2\/pages\/11315"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gilbert-tech.com\/en\/wp-json\/wp\/v2\/media\/15677"}],"wp:attachment":[{"href":"https:\/\/www.gilbert-tech.com\/en\/wp-json\/wp\/v2\/media?parent=15675"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}